October 2015 (1)
August 2015 (1)
June 2015 (1)
May 2015 (1)
February 2015 (1)
January 2015 (1)
November 2014 (2)
October 2014 (2)
September 2014 (6)
August 2014 (1)
July 2014 (5)
June 2014 (1)
March 2014 (3)
February 2014 (2)
January 2014 (1)
November 2013 (3)
October 2013 (1)
August 2013 (3)
July 2013 (4)
May 2013 (4)
April 2013 (3)
March 2013 (2)
February 2013 (3)
January 2013 (4)
December 2012 (6)
November 2012 (9)
October 2012 (10)
September 2012 (9)
August 2012 (14)
July 2012 (17)
June 2012 (14)
May 2012 (13)
April 2012 (18)
March 2012 (14)
February 2012 (10)
January 2012 (12)
December 2011 (8)
November 2011 (11)
October 2011 (10)
September 2011 (13)
August 2011 (10)
July 2011 (6)
June 2011 (12)
May 2011 (8)
April 2011 (8)
March 2011 (9)
February 2011 (6)
January 2011 (9)
December 2010 (8)
November 2010 (17)
October 2010 (8)
September 2010 (12)
August 2010 (15)
July 2010 (10)
June 2010 (15)
May 2010 (9)
April 2010 (11)
March 2010 (13)
February 2010 (10)
January 2010 (14)
December 2009 (14)
November 2009 (10)
October 2009 (17)
September 2009 (20)
August 2009 (18)
July 2009 (22)
June 2009 (12)
Answering Questions
Avista Utilities
Clark Fork
Community Service
Customer Service
Energy Assistance
Energy Efficiency
Environment Facts
Hydro power
Infrastructure upgrades
Lake Coeur d'Alene
Natural Gas
Power Outages
Reliability Facts
Renewable Energy
Renewable Facts
Smart Grid
Spokane River

Long runoff season on the Spokane River affects recreation and maintenance project at Post Falls Dam   


Post Falls Dam


Will summer ever get here? That’s seems to be a common question heard around the Spokane area these days and at Avista too. As you make plans for the upcoming weekends and July 4 holiday, we want to keep you up to date on changing conditions in the Spokane River as well as educate you about a project we are working on at the Post Falls Dam.
We’ve started closing spill gates at our Post Falls Dam now that Coeur d’Alene Lake is back below the maximum summer level of 2,128 feet. However, heavy rainfall throughout the month of June has slowed our process, and we’ve had to make ongoing adjustments to accommodate river flows, which have increased rapidly on a number of occasions, as recently as Tuesday, June 26.

Closing spill gates causes the river level below the dam to decrease. With this in mind, the spill gates need to be closed gradually, so that fish below the dam are not stranded in pools of water. To achieve this we close spill gates at a rate that decreases the downstream river level no more than four inches per hour, which is required by our Federal Energy Regulatory Commission (FERC) license to operate our dams on the Spokane River.

As the river flows stabilize, we continue to close the remaining spill gates. As the spill gates are closed the elevation of the river above the dam increases, which provides additional recreational opportunities on the river. Once the final spill gate is closed, the Q’emiln Park boat launch in Post Falls can be opened for the summer season. Typically this occurs sometime between Memorial Day and mid-July. The median date for closing the gates is June 22. We don’t expect to close the final spill gate until after July 4 due to this year’s rainfall and extended high spring runoff season.

We’d like to remind you to always exercise caution on the water, as river and lake levels can change at any time depending on weather and other factors. The water is still cold, which puts those who are recreating on or near a lake or river at risk for hypothermia.

The best way to get the most current information on anticipated elevation changes on Coeur d’Alene Lake, Lake Spokane, and the Spokane River is to call Avista’s 24-hour telephone information line.

In Idaho, call (208) 769-1357; in Washington, call (509) 495-8043.

The recorded information is provided to advise shoreline property owners, commercial and recreational users of changes in lake and river elevation levels that may affect plans for water use. You can also check current river and lake levels on our website.
Avista’s summer work at Post Falls Dam
The dam needs ongoing maintenance and updates to keep it running safely and efficiently. This summer after the spring runoff season ends, Avista will be undertaking two projects to do that.
We’re planning to sandblast, repair and repaint the south channel spill gates, something that needs to be done every 30 to 40 years. We also plan to replace the lifting hoist and old timber intake gates that let water flow through the dam to the generator turbines at Post Falls Dam with new lifting hoists and steel gates.

Normally the generator turbines can pass about 5,400 cubic feet per second (cfs). Any additional water has to flow through the spill gates.

During the work, at least two generator units must be taken offline, which reduces the amount of water the power house can pass at any one time. This means the total river flow will need to be lower than normal before we can close all the spill gates and the Q’emiln Park boat launch can be opened.
Depending on weather, this will likely be about the second or third week of July.

During the project, we’ll do our best to minimize the disruption to recreation and power generation as much as possible, but the work is important so we can continue to safely generate clean, reliable hydropower. We'll be sure to keep you updated as the project reaches completion.
Posted by  System Account  on  6/28/2012
0  Comments  | 0  Links to this post | Bookmark this post with:          


Add a Comment

We encourage comments on this blog, but this is a family friendly conversation, so please check out our discussion guidelines so we’re all on the same page. By submitting a comment, you agree to these terms and our Privacy Policy.  

Customers must have a My Account and be logged in to comment.
Login to My Account | Create My Account


We're hopeful that this space will encourage thought provoking and informative community discussions about issues related to our products and services. Currently you must be an Avista customer to participate in the conversation, but stay tuned. In the coming weeks we'll also provide an opportunity for non-customers to participate in this forum.