Avista Utilities Home
|
Avista Corp. Home
|
Contact Us
DEIS Comments
License Documents
Post-Filing Documents
Spokane River
License Application
Washington 401 Certification Application
Post Falls
License Application
Search the Spokane River Site
License Documents
Purpose
Meetings
[No Meetings.]
Documents
11 Records Found. Displaying page 1 of 2:
9/18/09
Upper Falls aesthetic spills modification request
9/17/09
Order modifying and approving Water Quality Monitoring and Quality Assurance Project Plan pursuant to Article 401(A)(12)
9/10/09
Letter regarding minimum discharge flows at the Upper Falls and Monroe Street HEDs
9/ 8/09
Submittal to DOE regarding the annual maintennance schedule for cleaning the sumps to remove oil and residue from walls, piping, and other structures in contact with sump water at Upper Falls, Monroe Street, Nine Mile and Long Lake HED
8/14/09
Letter transmitting the Water Quality Monitoring and Quality Assurance Project Plan as required by Section 5.10.A of the WA 401 WQC
8/13/09
Submittal of the Water Quality Monitoring and Quality Assurance Project Plan (QAPP) as required by Article 401 of the Spokane River License
8/13/09
Avista's submittal to WDOE pertainting to the SPCC/SDCC Plans for the Spokane River Project
7/29/09
Order Granting Extension of Time to file Exhibit G Maps
7/16/09
Avista's filing to DOE regarding the 401 Certification Conditions for the Spokane River Project
7/16/09
Avista's request for clarification of 06/18/2009 Order issuing new License for the Spokane River Project
1
2
[Next >>]
back to top
© 2009 Avista Corporation. All rights reserved.
Privacy Policy