Archives
August 2015 (1)
June 2015 (1)
May 2015 (1)
February 2015 (1)
January 2015 (1)
November 2014 (2)
October 2014 (2)
September 2014 (6)
August 2014 (1)
July 2014 (5)
June 2014 (1)
March 2014 (3)
February 2014 (2)
January 2014 (1)
November 2013 (3)
October 2013 (1)
August 2013 (3)
July 2013 (4)
May 2013 (4)
April 2013 (3)
March 2013 (2)
February 2013 (3)
January 2013 (4)
December 2012 (6)
November 2012 (9)
October 2012 (10)
September 2012 (9)
August 2012 (14)
July 2012 (17)
June 2012 (14)
May 2012 (13)
April 2012 (18)
March 2012 (14)
February 2012 (10)
January 2012 (12)
December 2011 (8)
November 2011 (11)
October 2011 (10)
September 2011 (13)
August 2011 (10)
July 2011 (6)
June 2011 (12)
May 2011 (8)
April 2011 (8)
March 2011 (9)
February 2011 (6)
January 2011 (9)
December 2010 (8)
November 2010 (17)
October 2010 (8)
September 2010 (12)
August 2010 (15)
July 2010 (10)
June 2010 (15)
May 2010 (9)
April 2010 (11)
March 2010 (13)
February 2010 (10)
January 2010 (14)
December 2009 (14)
November 2009 (10)
October 2009 (17)
September 2009 (20)
August 2009 (18)
July 2009 (22)
June 2009 (12)
Categories
Answering Questions
Avista Utilities
CFLs
Clark Fork
Community Service
Customer Service
Electricity
Energy Assistance
Energy Efficiency
Environment
Environment Facts
Events
Hydro power
Idaho
Infrastructure upgrades
Lake Coeur d'Alene
Natural Gas
Oregon
Power Outages
Rates
Rebates/Incentives
Reliability Facts
Renewable Energy
Renewable Facts
Safety
Smart Grid
Spokane River
Video
Washington
Weather
Wildlife
Wind

Improving service in the Silver Valley   

Tags: Avista Utilities, Electricity, Idaho, Infrastructure upgrades, Rates, Weather

Burke-Thompson
Vertical brace
The Burke-Thompson Falls A and B  trans-
mission structures were originally constructed
in 1924. Avista crews are replacing the old
wooden poles with taller, steel poles. The
new  design will stage the poles closer to
the center of the right of way, which will
improve efficiency, as the likelihood of a
tree falling on the line diminishes. The new
design requires 50 percent fewer poles as
well.
Temporary bridge
To access the Burke-Thompson Falls A and
B transmission lines, we’re building three
temporary bridges so our equipment can
safely cross. Shown below, a temporary
bridge a crew is setting over the existing
bridge.
Avista upgrades nearly 90-year old equipment to improve safety and reliability
 

At the east end of the Silver Valley stands the Burke-Thompson Falls A and B transmission lines. Our customers in this region depend on these primary “arteries” of power to deliver electricity to their homes and businesses.

Situated in a remote location near the Idaho/Montana border, maintaining the Burke-Thompson Falls lines carries its own set of challenges. And part of the solution is rebuilding 8-miles of lines to better serve our customers.

The rural reality
The Silver Valley is known for its beautiful forests and ample snow in the winter. The rural reality – lots of snow and trees don’t bode well for transmission lines.
 
“The snow levels can get very high in that area,” said Kellogg Operations Manager Bob Beitz. “When outages occur in the winter, we can't access them without a Sno-Cat. When our crews jump out of the cat, they are up to their armpits in snow. Trying to replace a pole in those conditions is a herculean effort.”

All that snow can weigh heavily on the forested areas near the power lines, which can result in falling branches and toppling trees. Even if our rights of way are 100-feet wide, falling trees can cause power outages. 

The solution: A rebuild to alleviate outages and concerns
This year, we’re rebuilding 8 miles of electric transmission lines from Burke to the Montana border to improve the safety and reliability of delivering power to our customers. The project carries a price tag of $2.5 million. It’s part of Avista’s ongoing investments to maintain and upgrade our electric system.

The transmission lines were originally constructed in 1924. Though updated several times over the decades, many of the original structures still exist and will be replaced this year. We’ll be re-using the existing wire for the project.

Avista crews are replacing the old wooden poles with taller, steel poles. The new design will stage the poles closer to the center of the right of way, which will improve efficiency, as the likelihood of a tree falling on the line diminishes. The new design requires 50 percent fewer poles as well.

Investing in the future
Many parts of our system are 30, 40 and even 50 years old. Some of the poles on the Burke-Thompson Falls A and B lines are nearly 90 years old.

As we rebuild this section of our electric transmission system, we’ll also have to build three temporary bridges to accommodate the heavy equipment necessary for the construction project.

It’s a big job, but it’s well worth the effort. This is another example of what it takes to provide safe, reliable service for our customers, now – and in the future.
 
Posted by  System Account  on  7/10/2012
0  Comments  | 0  Links to this post | Bookmark this post with:          
 

Comments

Add a Comment


We encourage comments on this blog, but this is a family friendly conversation, so please check out our discussion guidelines so we’re all on the same page. By submitting a comment, you agree to these terms and our Privacy Policy.  

Customers must have a My Account and be logged in to comment.
Login to My Account | Create My Account


Name:    
Comments:    



We're hopeful that this space will encourage thought provoking and informative community discussions about issues related to our products and services. Currently you must be an Avista customer to participate in the conversation, but stay tuned. In the coming weeks we'll also provide an opportunity for non-customers to participate in this forum.